Co-location Data Center

General Contractor: Symtech

This 20,000 sq. ft. facility was completed by Symtech, acting as the Prime Design-Build Contractor.

Symtech was responsible for coordinating all sub trade activities, ensuring compatibility with the master construction schedule of the facility. Our team installed the complex electrical system, which required synchronization with several roof top generators. This extended electrical services from the main electrical room and the roof via 3,200 Amp parallel bus duct systems and six 500kW APC UPS systems. Additionally, Symtech completed the installation of a state-of-the-art, energy efficient efficient LED lighting system and complex control system, both equipped with the newest technologies in fire detection and security.